
Uzbekistan AMUZANG Ⅰ&Ⅱ Pump Station
The project includes Amuzang I Main Pump Station, AMUZANG II Temporary Pump Station and AMUZANGⅠ Pump Station.
HNAC design and produce the SCADA system, protection system and low voltage switchgears with installation guidance and debugging.
The project was put in operation in November, 2013.
Previous
Previous