Engineering Contractor

Reliable EPC contractor for the hydropower, new energy, substation, pump station, and water treatment projects
+

Water Treatment Project of Shenyang Jinshan Thermal Power Plant

The project, with a scale of 234m³/h, adopts urban reclaimed water as raw water, and the full membrane method to treat supercritical unit feed water. By the application of the pretreatment method of + UF + DRO + EDI as the main process, the treated water quality can be >15 Mῼ·cm.
视频标题