Foundation Hydel Power Plant (FHPP) 3/4 Project, Pakistan
The project is invested by Pakistan Atomic Energy Commission Foundation.
Design head: 13m; Design flow: 46m3/s
Installed capacity: 2*2.5MW (vertical Axial-flow turbine)
HNAC is responsible for the EPC general contacting and civil engineering design of the project. The No. 1 Unit was put into operation on 4 October, 2016. The No. 2 Unit was commissioned in July, 2017.