Engineering Contractor

Reliable EPC contractor for the hydropower, new energy, substation, pump station, and water treatment projects
Kasanjiku Hydropower Peoject (0.64MW), Zambia
Kasanjiku Hydropower Peoject (0.64MW), Zambia
+
  • Kasanjiku Hydropower Peoject (0.64MW), Zambia
  • Kasanjiku Hydropower Peoject (0.64MW), Zambia

Kasanjiku Hydropower Peoject (0.64MW), Zambia

Zambia Kasanjiku Mini Hydropower Station is invested by Zambia Rural Electrification Authority and located at Kasanjiku Falls on Kasanjiku River in Mwinilunga District of North -Western Province of Zambia, with a design head of 12.4m, design water flow of 6.2m³/s, and installed capacity of 640kW. HNAC was responsible for the entire engineering design, procurement, construction, commissioning, and was completed in 2018.
视频标题