Successful Factory Acceptance Test (FAT) for KIKULETWA 1.65MW HPP–Package I Project

Source:

Author:

Release time:

2025.02.27


HNAC was honored to host the project owner team from Tanzania for the Factory Acceptance Test (FAT) of the KIKULETWA 1.65MW Hydropower Plant (Package I) from February 14th to 26th, 2024.

During their visit, the delegation conducted a comprehensive inspection of key equipment, including generators, turbines, valves, switchgear, and control systems. The team expressed high satisfaction with the quality, performance, and reliability of our products, reinforcing our commitment to delivering industry-leading hydropower solutions.

In addition to the technical evaluations, HNAC organized specialized training sessions to enhance the team’s operational and maintenance expertise. This knowledge exchange not only strengthened technical collaboration but also fostered a deeper partnership for future projects.

We extend our sincere gratitude to the Tanzanian project team for their trust and collaboration. This successful FAT marks a significant milestone in the KIKULETWA HPP project, and we look forward to supporting its smooth implementation and long-term success.

Stay tuned for more updates as we continue to drive sustainable energy solutions worldwide!

视频标题