DR Congo Kinshasa 0Z0NE Water Supply Project:
The water delivery capacity of water intake pump house is 120,000m³/d. The water pumping station delivers 120,000 m³/d of water, and the daily treatment capacity of the water treatment plant is 110,000 m³/d.The deepening design of the water supply system drawings, procurement and supply of system equipment, on-site installation and commissioning, acceptance and transfer of training, as-built drawings, preparation of as-built data and after-sales service (after the completion of the acceptance of the system, the resident two operation and maintenance personnel will carry out maintenance for the overall system for three months).