90kV/10 kV Substation of SOMETA, Senegal

The 90kV/10kV substation of SOMETA is located in Dakar, the capital of Senegal. The substation needs to complete two 90kV incoming lines, 6 outgoing lines for the 10kV , and the installation and commissioning of an 8 MVA main transformer equipment.

110kV Substation EPC Contracting Project for Jinchi Energy and Material Co., Ltd.

The capacity of this project is 1×40 MVA +1×31.5MVA. HNAC provides the project with design, equipment production, installation and commissioning services and fulfills the one-time power transmission for the project within 6 months.

Overall Technical Upgrade and Transformation 110kV Substation Project

This project is the 110kV substation construction project for Qinghai Xianghe Nonferrous Metals Co., Ltd.'s overall upgrade and transformation, the harmless treatment of zinc smelting tailings and comprehensive recovery of valuable metals. HNAC provides the primary and secondary design, protection, measurement and control of the entire station, system supply and product installation and commissioning, the project was successfully put into operation after completing the transformation and construction of the entire station within 3 months.

Weng'an Longma Phosphorus Industry 110kV Substation Project

This project is a 110kV substation construction project for the comprehensive utilization of yellow phosphorus tail gas of Longma Phosphorus Industry Co., Ltd. HNAC provides the design, supply, installation and commissioning of the newly-added interval computer monitoring system and protection measurement and control system on this site. The project successfully put into operation and delivery of electricity after three-month renovation and construction.

Uzbekistan AMUZANG Ⅰ&Ⅱ Pump Station

The project includes Amuzang I Main Pump Station, AMUZANG II Temporary Pump Station and AMUZANGⅠ Pump Station. HNAC design and produce the SCADA system, protection system and low voltage switchgears with installation guidance and debugging. The project was put in operation in November, 2013.

Tianjin Haihekou Pumping Station

The project total investment is CNY five hundred and seventy two million thousand, it can realize joint dispatch with flood channels, estuary pumping stations and coastal sluices. It will play a major role in alleviating the pressure on Haihe River drainage, improving Tianjin's ability to deal with extreme weather, and ensuring the safety of flood control in the key area.

Lanzhou Dashagou Electric Pumping Irrigation Project

The project was built in 1966 and is located in the northwest of downtown Lanzhou. HNAC Technology provided the project with information technology services including water and rain forecasting, water quality analysis, pump station monitoring, gate monitoring, dam safety monitoring, pipeline monitoring, water supply dispatching, flood forecasting dispatching, etc.

Guangdong Jingfeng Lianwei Flood Prevention Scheduling Information Project

Jingfeng Lianwei Flood Prevention Scheduling Command Center is situated in Zhaoqing City, Guangdong Province. Xijiang River, it is one of 5 bunds in Pearl River Delta, and plays a key role in the rural and urban disaster prevention and reduction project in Guangdong Province.