6MW Photovoltaic + Energy Storage Project, Nauru
This project is the first photovoltaic + energy storage project in the Republic of Nauru. It is jointly constructed by HNAC and CHEC. The project content includes the design of a 6MW solar power station, a battery energy storage system (BESS) with a capacity of 2.5MWh/5MW, an 11kV substation, Installation and debugging.
Solar Mini Grids Project, Ethiopian
The project, as a part of the Ethiopian government's National Electrification Plan (NEP), is funded by the World Bank, and owned by the Ethiopian Electric Power Company (EEU). HNAC, as the main contractor, is responsible for providing design, supply, installation, commissioning and operation and maintenance services for 23.6 MWh energy storage, 6.92 MW solar power and 1.63 MVA DG for 21 villages under the project. After the completion of the project, it will provide over 50,000 residents in the surrounding area with a safe and stable power supply and end the history of living without electricity in local area.
1MW PV +800kWhBESS energy storage system,Pakistan
As the EPC contractor of the project, HNAC is responsible for the overall design, construction, equipment supply, installation and commissioning of the project. The project is the first photovoltaic + energy storage new energy power station in HUNZA Valley in northern Pakistan, and the project was completed on November 16, 2023, and the Chief Minister of GB region of Pakistan attended the ribbon-cutting ceremony.
Decentralized Wind Power Projects in Ningxiang, Xiangtan, Yuanjiang and Jinshi city
The project has an investment amounting to more than CNY 500 million, with 7 decentralized wind farms distributed in Changsha, Ningxiang, Xiangtan, Yuanjiang, Changdejin and other places in Hunan.
Luxi County Rural Electrification Project Photovoltaic
The project, distributed in 93 poor villages in Luxi County, has a construction scale of more than 13MW, an annual power generation capacity of about 12 million kWh, and a power generation income of more than CNY 10 million.
Shaoyang Chengbu Rulin 100MW/200MWh Energy Storage Power Station, Hunan Province
The construction scale is 100MW/200MWh, and the total investment is about CNY 400 million. It is the largest grid-side energy storage power station in Hunan Province and the largest grid-side energy storage power station invested by social capital in China.
The project is located on the north side of the west end of Houzishi Bridge in Yuelu District, Changsha City. It is equipped with 46 charging guns, 3 sets of 360kW charging piles on the ground, and 20 sets of 7kW AC charging piles in the underground garage to provide charging services for vehicles.
State Grid Hunan Chenzhou Jiucaiping Energy Storage Station
The project, built in Jiucaiping, Chenzhou, has a construction scale of 22.5MW/45MWh. It operates in an equipment leasing model, including leasing for battery system, variable-current booster cabin, and EMS system.
VANJ & VONAVD 110kV Substation,Tajikistan
The project is a 110kV substation operated by Pamir Energy. HNAC supplies all the E&M equipment for the project including transformers, disconnectors, CTs, PTs, switchgears, protection relays, cables and etc.
Sebzor 110kV Substation,Tajikistan
The project is constructed by Pamir Energy under the assistance of the poverty alleviation fund of Tajikistan KFW and donated by the Swiss Federal Department of Economic Development. HNAC supplies all the E&M equipment and guide the installation for the project.
33kV Msigani Switching Station,Tanzania
The project, funded by Tanzanian goverment, is an important part to improve the Tanzanian power grid. The Employer is Tanzania Electric Supply Company Limited(TANESCO). Tanzanian President Samia Suluhu Hassan witnessed the signing of the project and delivered an important speech. HNAC, as the EPC contractor of the project, is responsible for the design, supply, installation, testing and commissioning of the switching station.
Diesel Power Generation Project, Samoa
The project is financed by the Samoan government, and the Employer is the Samoa Electric Power Corporation (EPC). HNAC is responsible for the design, supply, installation and commissioning of the project. The total installed capacity is 8MW, of which 6MW is for UPOLU and 2MW for SAVAII. The successful implementation of the project will solve the electricity shortage of 30% of Samoa's population and bring good social effects.