90kV/10 kV Substation of SOMETA, Senegal
The 90kV/10kV substation of SOMETA is located in Dakar, the capital of Senegal. The substation needs to complete two 90kV incoming lines, 6 outgoing lines for the 10kV , and the installation and commissioning of an 8 MVA main transformer equipment.
110kV Substation EPC Contracting Project for Jinchi Energy and Material Co., Ltd.
The capacity of this project is 1×40 MVA +1×31.5MVA. HNAC provides the project with design, equipment production, installation and commissioning services and fulfills the one-time power transmission for the project within 6 months.
Overall Technical Upgrade and Transformation 110kV Substation Project
This project is the 110kV substation construction project for Qinghai Xianghe Nonferrous Metals Co., Ltd.'s overall upgrade and transformation, the harmless treatment of zinc smelting tailings and comprehensive recovery of valuable metals. HNAC provides the primary and secondary design, protection, measurement and control of the entire station, system supply and product installation and commissioning, the project was successfully put into operation after completing the transformation and construction of the entire station within 3 months.
Weng'an Longma Phosphorus Industry 110kV Substation Project
This project is a 110kV substation construction project for the comprehensive utilization of yellow phosphorus tail gas of Longma Phosphorus Industry Co., Ltd. HNAC provides the design, supply, installation and commissioning of the newly-added interval computer monitoring system and protection measurement and control system on this site. The project successfully put into operation and delivery of electricity after three-month renovation and construction.
Uzbekistan AMUZANG Ⅰ&Ⅱ Pump Station
The project includes Amuzang I Main Pump Station, AMUZANG II Temporary Pump Station and AMUZANGⅠ Pump Station. HNAC design and produce the SCADA system, protection system and low voltage switchgears with installation guidance and debugging. The project was put in operation in November, 2013.
Tianjin Haihekou Pumping Station
The project total investment is CNY five hundred and seventy two million thousand, it can realize joint dispatch with flood channels, estuary pumping stations and coastal sluices. It will play a major role in alleviating the pressure on Haihe River drainage, improving Tianjin's ability to deal with extreme weather, and ensuring the safety of flood control in the key area.
Lanzhou Dashagou Electric Pumping Irrigation Project
The project was built in 1966 and is located in the northwest of downtown Lanzhou. HNAC Technology provided the project with information technology services including water and rain forecasting, water quality analysis, pump station monitoring, gate monitoring, dam safety monitoring, pipeline monitoring, water supply dispatching, flood forecasting dispatching, etc.
Guangdong Jingfeng Lianwei Flood Prevention Scheduling Information Project
Jingfeng Lianwei Flood Prevention Scheduling Command Center is situated in Zhaoqing City, Guangdong Province. Xijiang River, it is one of 5 bunds in Pearl River Delta, and plays a key role in the rural and urban disaster prevention and reduction project in Guangdong Province.
DR Congo Kinshasa 0Z0NE Water Supply Project:
The water delivery capacity of water intake pump house is 120,000m³/d. The water pumping station delivers 120,000 m³/d of water, and the daily treatment capacity of the water treatment plant is 110,000 m³/d.The deepening design of the water supply system drawings, procurement and supply of system equipment, on-site installation and commissioning, acceptance and transfer of training, as-built drawings, preparation of as-built data and after-sales service (after the completion of the acceptance of the system, the resident two operation and maintenance personnel will carry out maintenance for the overall system for three months).
Municipal Water Supply Treatment-Nanjing Beihekou Water Plant
Beihekou Water Plant is the first domestic water plant designed and constructed entirely by the Chinese and the largest in Nanjing and one of the largest water plants in China. With the water supply scale of 1.2 million t/d, it supplies more than half of the water in the urban area of Nanjing. It adopts the method of flocculation and sedimentation + filtration and disinfection as the main process, and the automatic control system for the whole plant monitoring.
Municipal Sewage Treatment-Changsha Kaifu District Sewage Plant
The project capacity was raised to 300,000 ton/day and the effluent quality reached Level 1 standard after upgrading. It adopts MSBR+BAF for the main process and DCS to realize 3D monitoring.
Industrial Wastewater Treatment-Lihuayi Group Desalinated Water System
The project, with a capacity of about 4000m³/h and MMF+UF+DRO+EDI as its main process, it is currently one of the largest project using Full Membrane Method in China and the first project adopting Yellow River water as the water source of Full Membrane Method to produce desalinated water as boiler feed water.